21 Day Area: The backfill is now completed and the chemical storage tank is being installed.
2 Day Area: The water testing in tank 2 is currently underway and underground pipework is ongoing. The MCC trench is being completed with the blower base having been poured.
Thickener Building Area: Pipework is being laid below the drum thickener room and the reinforcement for the MCC walls is continuing.