Thursday 29 November 2007

2 Day Area Mcc Floor Metalwork and Underground Overflow Pipework


Work has begun around the back of the erected tanks on a supporot plinth and the MCC floor metalwork is complete.
The underground overflow pipework is completed for tank 1 and ongoing for tank 2.
"Without goals, and plans to reach them, you are like a ship that has set sail with no destination"
- Fitzhugh Dodson

Wednesday 28 November 2007

Thickener Building MCC and SAS

The MCC trench walls have now been poured with the SAS pipework ongoing under the thickener room and currently half finished according to scheduling. The valve chamber base has also been poured.

"Go as far as you can see, and when you get there you will see farther"
- Orson Swett Marden

Tuesday 27 November 2007

High Level Storm Tanks


For the High Level Storm Tanks, the mixing pipework has now been completed.
Aim for the top. There is plenty of room there. There are so few at the top it is almost lonely there.
- Samuel Insull

Monday 19 November 2007

November Developments




21 Day Area: The backfill is now completed and the chemical storage tank is being installed.

2 Day Area: The water testing in tank 2 is currently underway and underground pipework is ongoing. The MCC trench is being completed with the blower base having been poured.

Thickener Building Area: Pipework is being laid below the drum thickener room and the reinforcement for the MCC walls is continuing.

"The only true happiness comes from squandering ourselves for a purpose"
- William Cowper

Friday 9 November 2007

Thickening Building Area Blinding and Rebar


Blinding has been finished and construction for the ring beam for the poly room has started.
The rebar for the MCC trench has begun and ground trimmed to formation for the drum room.
"Common sense is the best sense I know of"
-Lord Chesterfield

21 Day Area Bases Completed


The bases in the 21 day area are now completed with the scabbling the rebate on tank 4 underway.
Backfilling around the tanks is ongoing.
"You sort of start thinking anything's possible if you've got enough nerve"
-J.K. Rowling

2 Day Area MCC and Steelwork




Blinding is currently being put in the base of the MCC trench in the 2 day tank area and the maintenance access steelwork has been erected up the middle of the tanks.