In the 2-day area the first tank roof has been positioned and secured by A Consult with the 2nd tank to follow.
The developments in the 21-day area consist of the concr
ete pouring for tank 3, the fixing of steel for tank 4, and the base having been poured on Monday with regards to tank 5.
In the thickening building area, Kellys are sinking the shaft for the new return liquors pumping station with the building on hold until the existing cables are diverted.
"Fortune favours the brave"
-Publius Terence
The developments in the 21-day area consist of the concr
In the thickening building area, Kellys are sinking the shaft for the new return liquors pumping station with the building on hold until the existing cables are diverted.
"Fortune favours the brave"
-Publius Terence
.jpg)
