21 Day Area Concrete Pouring


The base for tank 4 was poured on 26-10-07 and took until 3am with staff members enthusiasm highly commendable. The rebar for tank 3 was completed on the same day with the concrete to be poured on 01-11-07, completing all the concreting for that area
"I am where I am because I believe in all possibilities"
-Whoopi Goldberg


Friday 19 October 2007

2 Day Tank Area: Roof Lifted into Place




Marking the one year anniversary of Black & Veatch in the UK, the second tank roof in the 2 day area was lifted and placed as illustrated by the photos taken on the day.
"Act as if it were impossible to fail"
-Dorothea Brande

Wednesday 17 October 2007

October Summary



In the 2-day area the first tank roof has been positioned and secured by A Consult with the 2nd tank to follow.

The developments in the 21-day area consist of the concrete pouring for tank 3, the fixing of steel for tank 4, and the base having been poured on Monday with regards to tank 5.

In the thickening building area, Kellys are sinking the shaft for the new return liquors pumping station with the building on hold until the existing cables are diverted.

"Fortune favours the brave"
-Publius Terence

Wednesday 3 October 2007

2 Day Area Tank Erections




In the 2 day area the erection of the second tank is well underway with construction of the site drainage pumping station commenced


"The great and glorious masterpiece of man is to know how to live to purpose."

-Michel de Montaigne.

21 Day Area Preparation


Preparation has begun in the 21 day area with blinding put in the base ready for the concreting to be done shortly.
"If everyone is moving forward together then success takes care of itself"
-Henry Ford

Thickening Building

The groundworks have been commenced with regards to the base with excavation for the main shafts started for the return liquors pumping station.